high voltage case studies

150kV offshore wind farm cable installation

Elmeridge Cable Services (ecs) were contracted to install the 150kV Internal Platform Cables (IPC), Beach Transition Joint (BTJ) and Off Shore Platform (OSP) Export cables for the Dong Energy Westermost Rough wind farm project.

High Voltage Offshore Wind Farm Cable Installation in France

ecs rapidly mobilised specialist staff to install the IPC cables during the substation platform fabrication at Saint-Nazaire in North West France. The 150kV cable manufactured by LS Cable and System was installed and cleated using the Oglaend cleat system, before being terminated by qualified ecs staff with size 6S PFISTERER terminations.

Following installation of the approx. 12km of subsea export cable, ecs undertook the installation of the BTJ consisting three pre-fabricated XLPE joints between the three core 1200sqmm copper armoured subsea cable and the 1800sqmm aluminium single core land cables, as well as fitting the beach armour clamp and doing fibre optic jointing and associated earthing & bonding works.

After the export cable was pulled up the platform J tube, ecs undertook the fitting of the cable permanent hang-off, before routing the cables to the switchgear and installing size 6S PFISTERER terminations, fibre optic jointing and earthing & bonding works.

Contact us today for more information on our specialist high voltage cable services.


< Back to Case Studies

OUR PARTNERS

Logo: Pfisterer Logo: TE Connectivity
Logo: 3M
Logo: Utilise
Logo: fast2fibre
Logo: TBEA

Logo: Jointing Tech
Logo: General Cable
Logo: Morrison Utility Services
Logo: Thorne & Derrick
Logo: Emelec
Logo: LS Cable System
Logo: Ducab
Logo: Shang Shang Logo: NKT Cables
Logo: TKF

^ Back to top